Blog
From enquiry to quotation: five details that set the price
2026-11-18
An enquiry that reads only "please send your price for metal trays" cannot be quoted. The number a buyer receives is built from a drawing, a finish, a quantity, a packing method and a destination port, and every one of those five items moves the figure. When one is missing, the factory either guesses or comes back with questions, and both cost about a week.
Size and shape come first. A dimensioned drawing is better than a photograph, because a photo hides the depth of a draw and the radius of a corner. If no drawing exists, send the length, width, depth and the steel thickness you have in mind, plus the load the piece must carry. A tray that holds two kg of bottles is a different pressing from one that holds a candle.
Finish is the second variable. Electroplated gold, electroplated silver, powder coating and antique brass are priced differently because they run on different lines. Say which surface is visible after packing, whether the back is seen, and whether the piece will be handled daily or sit on a shelf. A gold-plated jewellery tray and a powder-coated waste bin share very little process.
Quantity sets the press setup and the plating batch. Three hundred pieces and three thousand pieces are not the same job, and the difference is not proportional. State the quantity you want for the first order and the quantity you expect per year, because a factory will price the first order differently when it can see a repeat behind it.
Packaging is where quotations quietly diverge. A polybag and a plain carton is one price. An inner wrap, a moulded insert, a printed sleeve and a pallet is another. If the goods go to a retailer who will not accept a crushed corner, say so at enquiry stage, because the carton grade and the layer pads are chosen at the same time as the price.
Destination port decides the freight term and the document set. FOB, CIF and DDP give three different numbers, and a buyer comparing three factories is often comparing three different terms without knowing it. Name the port and the Incoterm you work on. If you do not know the term, ask for FOB and add the freight yourself.
Put those five items in one message and a quotation usually returns in two to four working days, with a validity window and the tooling cost stated separately from the piece price. If the reply arrives without a drawing reference or a packing description, it is a rough number rather than a quotation, and it will move once production engineering looks at it.